don't worry about an isolation transformer just yet, you've got a bit of work to do before you need one. test the diodes D605, 606 607, and 608. if your meter has a diode check function, you will read about 0.7V (usually between 0.5 and 0.8) across one with the black meter lead on the striped end, and open circuit (it may start at a low value and begin climbing) with the leads reversed. if you have any that read low both ways, it's shorted. next you want to test the switching transistor Q601, from the middle pin to the right one. with the red meter lead on the center pin, it should read open circuit, with them reversed should be about 0.7V (same as the diodes). those are the major components which will blow the fuse