Well I'm afraid to delude you, luckily this is only an air conditioning system (designed by our top cowboy) with the control box assembly subcontracted to a company I've come to call Kemp destructions ltd because I never thought it possible for them to smash £ 150 worth of military grade switches when we only paid them £ 100 for the 2 hour job of assembly and for them to actually have the guts to try and claim on the carrier and then tell us to get stuffed when the carrier told them the same when they know full well that they wreked them during assembly/packing
I beleive that our radiator packs for the engines are are slightly better than this, we certaily do a better job than our usual supplier in the UAE who haven't learnt to solder yet (got some nice cross section photos once of core to tank "seam" with practically no solder and then we wonder why they last 6 months - comercial job luckily)