Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Now click on the project page on the dsn file, then select tools-> create netlist, check create or update PCB and click ok.
Add connect tool (F3) to make the connections between the parts. Be sure to check out the three tabs on the right of the screen, where you set layers, width etc in Option, then the Visibility, and Find which toggles which features of the part are selectable, like wires pins names etc. You should end up with about the same board like I posted before.
Also, use this to check the gerbers produced
Converting C:\Users\Abc\Documents\pcb\pcb.dsn to 16.3 Version Format.
Uprev Completed.
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(0.70, 2.50)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(1.60, 2.50)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.00, 3.80)
--------------------------------------------------------------------------------------------------------------------------------------
The following 2 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.10, 3.80)
(3.00, 3.80)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.00, 3.50)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.50, 2.50)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.20, 3.80)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.30, 3.80)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.40, 3.80)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.50, 4.00)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(1.30, 2.50)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.20, 2.10)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.10, 2.10)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(4.10, 2.10)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(5.20, 2.10)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(6.20, 2.10)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(7.20, 2.10)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.80, 5.20)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(8.50, 2.80)
********************************************************************************
*
* Design Rules Check
*
********************************************************************************
--------------------------------------------------
Checking Schematic: SCHEMATIC1
--------------------------------------------------
Checking Electrical Rules
WARNING(ORCAP-1831): Unconnected pin U1,CLK
WARNING(ORCAP-1831): Unconnected pin U1,C\L\R\
WARNING(ORCAP-1608): Net has no driving source N00658
Checking For Single Node Nets
WARNING(ORCAP-1600): Net has fewer than two connections GND
WARNING(ORCAP-1600): Net has fewer than two connections VCC
Checking For Unconnected Bus Nets
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.80, 5.20)
--------------------------------------------------------------------------------------------------------------------------------------
The following 2 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.80, 5.20)
(3.10, 5.20)
********************************************************************************
*
* Design Rules Check
*
********************************************************************************
--------------------------------------------------
Checking Schematic: SCHEMATIC1
--------------------------------------------------
Checking Electrical Rules
WARNING(ORCAP-1831): Unconnected pin U1,C\L\R\
Checking For Single Node Nets
WARNING(ORCAP-1600): Net has fewer than two connections GND
WARNING(ORCAP-1600): Net has fewer than two connections VCC
Checking For Unconnected Bus Nets
INFO(ORCAP-32002): Netlisting the design
INFO(ORCAP-32004): Design Name:
C:\Users\Abc\Documents\pcb\pcb.dsn
Netlist Directory:
C:\Users\Abc\Documents\pcb\allegro
Configuration File:
C:\Cadence\SPB_16.5\tools\capture\allegro.cfg
Spawning... "C:\Cadence\SPB_16.5\tools\capture\pstswp.exe" -pst -d "C:\Users\Abc\Documents\pcb\pcb.dsn" -n "C:\Users\Abc\Documents\pcb\allegro" -c "C:\Cadence\SPB_16.5\tools\capture\allegro.cfg" -v 3 -l 31 -s "" -j "PCB Footprint" -hpath "HPathForCollision"
#1 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D3: SCHEMATIC1, PAGE1 (4.70, 2.40).
#2 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D4: SCHEMATIC1, PAGE1 (5.70, 2.40).
#3 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D5: SCHEMATIC1, PAGE1 (6.70, 2.40).
#4 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D6: SCHEMATIC1, PAGE1 (1.70, 2.40).
#5 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D7: SCHEMATIC1, PAGE1 (7.70, 2.40).
#6 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D8: SCHEMATIC1, PAGE1 (0.80, 2.40).
#7 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance U1: SCHEMATIC1, PAGE1 (2.70, 4.30).
#8 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D1: SCHEMATIC1, PAGE1 (2.60, 2.40).
#9 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D2: SCHEMATIC1, PAGE1 (3.60, 2.40).
#10 ERROR(ORCAP-36018): Aborting Netlisting... Please correct
the above errors and retry.
Exiting... "C:\Cadence\SPB_16.5\tools\capture\pstswp.exe" -pst -d "C:\Users\Abc\Documents\pcb\pcb.dsn" -n "C:\Users\Abc\Documents\pcb\allegro" -c "C:\Cadence\SPB_16.5\tools\capture\allegro.cfg" -v 3 -l 31 -s "" -j "PCB Footprint" -hpath "HPathForCollision"
INFO(ORCAP-32005): *** Done ***
Converting C:\Users\Abc\Documents\pcb\pcb.dsn to 16.3 Version Format.
Uprev Completed.
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(0.70, 2.50)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(1.60, 2.50)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.00, 3.80)
--------------------------------------------------------------------------------------------------------------------------------------
The following 2 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.10, 3.80)
(3.00, 3.80)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.00, 3.50)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.50, 2.50)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.20, 3.80)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.30, 3.80)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.40, 3.80)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.50, 4.00)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(1.30, 2.50)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.20, 2.10)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.10, 2.10)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(4.10, 2.10)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(5.20, 2.10)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(6.20, 2.10)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(7.20, 2.10)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.80, 5.20)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(8.50, 2.80)
********************************************************************************
*
* Design Rules Check
*
********************************************************************************
--------------------------------------------------
Checking Schematic: SCHEMATIC1
--------------------------------------------------
Checking Electrical Rules
WARNING(ORCAP-1831): Unconnected pin U1,CLK
WARNING(ORCAP-1831): Unconnected pin U1,C\L\R\
WARNING(ORCAP-1608): Net has no driving source N00658
Checking For Single Node Nets
WARNING(ORCAP-1600): Net has fewer than two connections GND
WARNING(ORCAP-1600): Net has fewer than two connections VCC
Checking For Unconnected Bus Nets
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.80, 5.20)
--------------------------------------------------------------------------------------------------------------------------------------
The following 2 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.80, 5.20)
(3.10, 5.20)
********************************************************************************
*
* Design Rules Check
*
********************************************************************************
--------------------------------------------------
Checking Schematic: SCHEMATIC1
--------------------------------------------------
Checking Electrical Rules
WARNING(ORCAP-1831): Unconnected pin U1,C\L\R\
Checking For Single Node Nets
WARNING(ORCAP-1600): Net has fewer than two connections GND
WARNING(ORCAP-1600): Net has fewer than two connections VCC
Checking For Unconnected Bus Nets
INFO(ORCAP-32002): Netlisting the design
INFO(ORCAP-32004): Design Name:
C:\Users\Abc\Documents\pcb\pcb.dsn
Netlist Directory:
C:\Users\Abc\Documents\pcb\allegro
Configuration File:
C:\Cadence\SPB_16.5\tools\capture\allegro.cfg
Spawning... "C:\Cadence\SPB_16.5\tools\capture\pstswp.exe" -pst -d "C:\Users\Abc\Documents\pcb\pcb.dsn" -n "C:\Users\Abc\Documents\pcb\allegro" -c "C:\Cadence\SPB_16.5\tools\capture\allegro.cfg" -v 3 -l 31 -s "" -j "PCB Footprint" -hpath "HPathForCollision"
#1 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D3: SCHEMATIC1, PAGE1 (4.70, 2.40).
#2 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D4: SCHEMATIC1, PAGE1 (5.70, 2.40).
#3 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D5: SCHEMATIC1, PAGE1 (6.70, 2.40).
#4 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D6: SCHEMATIC1, PAGE1 (1.70, 2.40).
#5 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D7: SCHEMATIC1, PAGE1 (7.70, 2.40).
#6 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D8: SCHEMATIC1, PAGE1 (0.80, 2.40).
#7 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance U1: SCHEMATIC1, PAGE1 (2.70, 4.30).
#8 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D1: SCHEMATIC1, PAGE1 (2.60, 2.40).
#9 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D2: SCHEMATIC1, PAGE1 (3.60, 2.40).
#10 ERROR(ORCAP-36018): Aborting Netlisting... Please correct
the above errors and retry.
Exiting... "C:\Cadence\SPB_16.5\tools\capture\pstswp.exe" -pst -d "C:\Users\Abc\Documents\pcb\pcb.dsn" -n "C:\Users\Abc\Documents\pcb\allegro" -c "C:\Cadence\SPB_16.5\tools\capture\allegro.cfg" -v 3 -l 31 -s "" -j "PCB Footprint" -hpath "HPathForCollision"
INFO(ORCAP-32005): *** Done ***
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.30, 5.20)
--------------------------------------------------------------------------------------------------------------------------------------
The following 2 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.30, 5.20)
(3.10, 5.20)
--------------------------------------------------------------------------------------------------------------------------------------
The following 3 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.80, 5.20)
(3.30, 5.20)
(3.10, 5.20)
********************************************************************************
*
* Design Rules Check
*
********************************************************************************
--------------------------------------------------
Checking Schematic: SCHEMATIC1
--------------------------------------------------
Checking Electrical Rules
Checking For Single Node Nets
WARNING(ORCAP-1600): Net has fewer than two connections GND
WARNING(ORCAP-1600): Net has fewer than two connections VCC
Checking For Unconnected Bus Nets
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(4.80, 5.20)
--------------------------------------------------------------------------------------------------------------------------------------
The following 2 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(4.80, 5.20)
(3.30, 5.80)
--------------------------------------------------------------------------------------------------------------------------------------
The following 3 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(1.90, 5.10)
(4.80, 5.20)
(3.30, 5.80)
********************************************************************************
*
* Design Rules Check
*
********************************************************************************
--------------------------------------------------
Checking Schematic: SCHEMATIC1
--------------------------------------------------
Checking Electrical Rules
Checking For Single Node Nets
WARNING(ORCAP-1600): Net has fewer than two connections GND
WARNING(ORCAP-1600): Net has fewer than two connections VCC
Checking For Unconnected Bus Nets
********************************************************************************
*
* Design Rules Check
*
********************************************************************************
--------------------------------------------------
Checking Schematic: SCHEMATIC1
--------------------------------------------------
Checking Electrical Rules
Checking For Single Node Nets
WARNING(ORCAP-1600): Net has fewer than two connections GND
WARNING(ORCAP-1600): Net has fewer than two connections VCC
Checking For Unconnected Bus Nets
INFO(ORCAP-32002): Netlisting the design
INFO(ORCAP-32004): Design Name:
C:\Users\Abc\Documents\pcb\pcb.dsn
Netlist Directory:
C:\Users\Abc\Documents\pcb\allegro
Configuration File:
C:\Cadence\SPB_16.5\tools\capture\allegro.cfg
Spawning... "C:\Cadence\SPB_16.5\tools\capture\pstswp.exe" -pst -d "C:\Users\Abc\Documents\pcb\pcb.dsn" -n "C:\Users\Abc\Documents\pcb\allegro" -c "C:\Cadence\SPB_16.5\tools\capture\allegro.cfg" -v 3 -l 31 -s "" -j "PCB Footprint" -hpath "HPathForCollision"
#1 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance U1: SCHEMATIC1, PAGE1 (2.70, 4.30).
#2 ERROR(ORCAP-36018): Aborting Netlisting... Please correct the above errors and retry.
Exiting... "C:\Cadence\SPB_16.5\tools\capture\pstswp.exe" -pst -d "C:\Users\Abc\Documents\pcb\pcb.dsn" -n "C:\Users\Abc\Documents\pcb\allegro" -c "C:\Cadence\SPB_16.5\tools\capture\allegro.cfg" -v 3 -l 31 -s "" -j "PCB Footprint" -hpath "HPathForCollision"
INFO(ORCAP-32005): *** Done ***
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(7.20, 2.10)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.80, 5.20)
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(8.50, 2.80)
********************************************************************************
*
* Design Rules Check
*
********************************************************************************
--------------------------------------------------
Checking Schematic: SCHEMATIC1
--------------------------------------------------
Checking Electrical Rules
WARNING(ORCAP-1831): Unconnected pin U1,CLK
WARNING(ORCAP-1831): Unconnected pin U1,C\L\R\
WARNING(ORCAP-1608): Net has no driving source N00658
Checking For Single Node Nets
WARNING(ORCAP-1600): Net has fewer than two connections GND
WARNING(ORCAP-1600): Net has fewer than two connections VCC
Checking For Unconnected Bus Nets
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.80, 5.20)
--------------------------------------------------------------------------------------------------------------------------------------
The following 2 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.80, 5.20)
(3.10, 5.20)
********************************************************************************
*
* Design Rules Check
*
********************************************************************************
--------------------------------------------------
Checking Schematic: SCHEMATIC1
--------------------------------------------------
Checking Electrical Rules
WARNING(ORCAP-1831): Unconnected pin U1,C\L\R\
Checking For Single Node Nets
WARNING(ORCAP-1600): Net has fewer than two connections GND
WARNING(ORCAP-1600): Net has fewer than two connections VCC
Checking For Unconnected Bus Nets
INFO(ORCAP-32002): Netlisting the design
INFO(ORCAP-32004): Design Name:
C:\Users\Abc\Documents\pcb\pcb.dsn
Netlist Directory:
C:\Users\Abc\Documents\pcb\allegro
Configuration File:
C:\Cadence\SPB_16.5\tools\capture\allegro.cfg
Spawning... "C:\Cadence\SPB_16.5\tools\capture\pstswp.exe" -pst -d "C:\Users\Abc\Documents\pcb\pcb.dsn" -n "C:\Users\Abc\Documents\pcb\allegro" -c "C:\Cadence\SPB_16.5\tools\capture\allegro.cfg" -v 3 -l 31 -s "" -j "PCB Footprint" -hpath "HPathForCollision"
#1 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D3: SCHEMATIC1, PAGE1 (4.70, 2.40).
#2 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D4: SCHEMATIC1, PAGE1 (5.70, 2.40).
#3 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D5: SCHEMATIC1, PAGE1 (6.70, 2.40).
#4 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D6: SCHEMATIC1, PAGE1 (1.70, 2.40).
#5 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D7: SCHEMATIC1, PAGE1 (7.70, 2.40).
#6 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D8: SCHEMATIC1, PAGE1 (0.80, 2.40).
#7 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance U1: SCHEMATIC1, PAGE1 (2.70, 4.30).
#8 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D1: SCHEMATIC1, PAGE1 (2.60, 2.40).
#9 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance D2: SCHEMATIC1, PAGE1 (3.60, 2.40).
#10 ERROR(ORCAP-36018): Aborting Netlisting... Please correct
the above errors and retry.
Exiting... "C:\Cadence\SPB_16.5\tools\capture\pstswp.exe" -pst -d "C:\Users\Abc\Documents\pcb\pcb.dsn" -n "C:\Users\Abc\Documents\pcb\allegro" -c "C:\Cadence\SPB_16.5\tools\capture\allegro.cfg" -v 3 -l 31 -s "" -j "PCB Footprint" -hpath "HPathForCollision"
INFO(ORCAP-32005): *** Done ***
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.30, 5.20)
--------------------------------------------------------------------------------------------------------------------------------------
The following 2 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(3.30, 5.20)
(3.10, 5.20)
--------------------------------------------------------------------------------------------------------------------------------------
The following 3 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(2.80, 5.20)
(3.30, 5.20)
(3.10, 5.20)
********************************************************************************
*
* Design Rules Check
*
********************************************************************************
--------------------------------------------------
Checking Schematic: SCHEMATIC1
--------------------------------------------------
Checking Electrical Rules
Checking For Single Node Nets
WARNING(ORCAP-1600): Net has fewer than two connections GND
WARNING(ORCAP-1600): Net has fewer than two connections VCC
Checking For Unconnected Bus Nets
--------------------------------------------------------------------------------------------------------------------------------------
The following 1 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(4.80, 5.20)
--------------------------------------------------------------------------------------------------------------------------------------
The following 2 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(4.80, 5.20)
(3.30, 5.80)
--------------------------------------------------------------------------------------------------------------------------------------
The following 3 points have been identified as net connectivity change points from the last operation
--------------------------------------------------------------------------------------------------------------------------------------
(1.90, 5.10)
(4.80, 5.20)
(3.30, 5.80)
********************************************************************************
*
* Design Rules Check
*
********************************************************************************
--------------------------------------------------
Checking Schematic: SCHEMATIC1
--------------------------------------------------
Checking Electrical Rules
Checking For Single Node Nets
WARNING(ORCAP-1600): Net has fewer than two connections GND
WARNING(ORCAP-1600): Net has fewer than two connections VCC
Checking For Unconnected Bus Nets
********************************************************************************
*
* Design Rules Check
*
********************************************************************************
--------------------------------------------------
Checking Schematic: SCHEMATIC1
--------------------------------------------------
Checking Electrical Rules
Checking For Single Node Nets
WARNING(ORCAP-1600): Net has fewer than two connections GND
WARNING(ORCAP-1600): Net has fewer than two connections VCC
Checking For Unconnected Bus Nets
INFO(ORCAP-32002): Netlisting the design
INFO(ORCAP-32004): Design Name:
C:\Users\Abc\Documents\pcb\pcb.dsn
Netlist Directory:
C:\Users\Abc\Documents\pcb\allegro
Configuration File:
C:\Cadence\SPB_16.5\tools\capture\allegro.cfg
Spawning... "C:\Cadence\SPB_16.5\tools\capture\pstswp.exe" -pst -d "C:\Users\Abc\Documents\pcb\pcb.dsn" -n "C:\Users\Abc\Documents\pcb\allegro" -c "C:\Cadence\SPB_16.5\tools\capture\allegro.cfg" -v 3 -l 31 -s "" -j "PCB Footprint" -hpath "HPathForCollision"
#1 ERROR(ORCAP-36002): Property "PCB Footprint" missing from instance U1: SCHEMATIC1, PAGE1 (2.70, 4.30).
#2 ERROR(ORCAP-36018): Aborting Netlisting... Please correct the above errors and retry.
Exiting... "C:\Cadence\SPB_16.5\tools\capture\pstswp.exe" -pst -d "C:\Users\Abc\Documents\pcb\pcb.dsn" -n "C:\Users\Abc\Documents\pcb\allegro" -c "C:\Cadence\SPB_16.5\tools\capture\allegro.cfg" -v 3 -l 31 -s "" -j "PCB Footprint" -hpath "HPathForCollision"
INFO(ORCAP-32005): *** Done ***
INFO(ORCAP-32002): Netlisting the design
INFO(ORCAP-32004): Design Name:
C:\Users\Abc\Documents\pcb\pcb.dsn
Netlist Directory:
C:\Users\Abc\Documents\pcb\allegro
Configuration File:
C:\Cadence\SPB_16.5\tools\capture\allegro.cfg
Spawning... "C:\Cadence\SPB_16.5\tools\capture\pstswp.exe" -pst -d "C:\Users\Abc\Documents\pcb\pcb.dsn" -n "C:\Users\Abc\Documents\pcb\allegro" -c "C:\Cadence\SPB_16.5\tools\capture\allegro.cfg" -v 3 -l 31 -s "" -j "PCB Footprint" -hpath "HPathForCollision"
Scanning netlist files ...
Loading... C:\Users\Abc\Documents\pcb\allegro/pstchip.dat
Loading... C:\Users\Abc\Documents\pcb\allegro/pstchip.dat
Loading... C:\Users\Abc\Documents\pcb\allegro/pstxprt.dat
Loading... C:\Users\Abc\Documents\pcb\allegro/pstxnet.dat
packaging the design view...
Exiting... "C:\Cadence\SPB_16.5\tools\capture\pstswp.exe" -pst -d "C:\Users\Abc\Documents\pcb\pcb.dsn" -n "C:\Users\Abc\Documents\pcb\allegro" -c "C:\Cadence\SPB_16.5\tools\capture\allegro.cfg" -v 3 -l 31 -s "" -j "PCB Footprint" -hpath "HPathForCollision"
INFO(ORCAP-32005): *** Done ***
********************************************************************************
*
* Updating Allegro PCB Editor Board
*
********************************************************************************
INFO(ORCAP-32040): Updating Allegro PCB Editor Board
Spawning... netrev.exe -5 -y 1 -n -i "C:\Users\Abc\Documents\pcb\allegro" "C:\Users\Abc\Documents\pcb\allegro\pcb.brd" "C:\Users\Abc\Documents\pcb\allegro\pcb.brd"
Reading File : C:/Users/Abc/Documents/pcb/allegro/pstchip.dat
(00:00:00.07)
Reading File : C:/Users/Abc/Documents/pcb/allegro/pstxprt.dat
(00:00:00.01)
Reading File : C:/Users/Abc/Documents/pcb/allegro/pstxnet.dat
(00:00:00.00)
Starting to process component instances
Finished component instance processing
Starting to check device models
Finished checking device models
Starting to process nets
Finished net processing
Starting to process slot properties
Finished slot property processing
Starting to process component instance properties
Finished component instance property processing
Performing a partial database check before saving.
Writing database to disk.
'pcb.brd' saved to disk.
netrev run on Apr 7 20:21:06 2013
DESIGN NAME : 'PCB'
PACKAGING ON Apr 21 2011 10:02:30
No error detected
No oversight detected
No warning detected
cpu time 0:01:16
elapsed time 0:00:00
Exiting... netrev.exe -5 -y 1 -n -i "C:\Users\Abc\Documents\pcb\allegro" "C:\Users\Abc\Documents\pcb\allegro\pcb.brd" "C:\Users\Abc\Documents\pcb\allegro\pcb.brd"
(---------------------------------------------------------------------)
( )
( Allegro Netrev Import Logic )
( )
( Drawing : pcb.brd )
( Software Version : 16.5P002 )
( Date/Time : Sun Apr 07 20:21:06 2013 )
( )
(---------------------------------------------------------------------)
------ Directives ------
RIPUP_ETCH FALSE;
RIPUP_DELETE_FIRST_SEGMENT FALSE;
RIPUP_RETAIN_BONDWIRE FALSE;
RIPUP_SYMBOLS ALWAYS;
Missing symbol has error FALSE;
SCHEMATIC_DIRECTORY 'C:\Users\Abc\Documents\pcb\allegro';
BOARD_DIRECTORY '';
OLD_BOARD_NAME 'pcb.brd';
NEW_BOARD_NAME 'pcb.brd';
CmdLine: netrev.exe -5 -y 1 -n -i C:\Users\Abc\Documents\pcb\allegro C:\Users\Abc\Documents\pcb\allegro\pcb.brd C:\Users\Abc\Documents\pcb\allegro\pcb.brd
------ Preparing to read pst files ------
Starting to read C:/Users/Abc/Documents/pcb/allegro/pstchip.dat
Finished reading C:/Users/Abc/Documents/pcb/allegro/pstchip.dat (00:00:00.07)
Starting to read C:/Users/Abc/Documents/pcb/allegro/pstxprt.dat
Finished reading C:/Users/Abc/Documents/pcb/allegro/pstxprt.dat (00:00:00.01)
Starting to read C:/Users/Abc/Documents/pcb/allegro/pstxnet.dat
Finished reading C:/Users/Abc/Documents/pcb/allegro/pstxnet.dat (00:00:00.00)
------ Oversights/Warnings/Errors ------
------ Library Paths ------
MODULEPATH = .
C:/Cadence/SPB_16.5/share/local/pcb/modules
PSMPATH = .
symbols
..
../symbols
C:/Cadence/SPB_16.5/share/local/pcb/symbols
C:/Cadence/SPB_16.5/share/pcb/pcb_lib/symbols
C:/Cadence/SPB_16.5/share/pcb/allegrolib/symbols
PADPATH = .
symbols
..
../symbols
C:/Cadence/SPB_16.5/share/local/pcb/padstacks
C:/Cadence/SPB_16.5/share/pcb/pcb_lib/symbols
C:/Cadence/SPB_16.5/share/pcb/allegrolib/symbols
------ Summary Statistics ------
netrev run on Apr 7 20:21:06 2013
DESIGN NAME : 'PCB'
PACKAGING ON Apr 21 2011 10:02:30
COMPILE 'logic'
CHECK_PIN_NAMES OFF
CROSS_REFERENCE OFF
FEEDBACK OFF
INCREMENTAL OFF
INTERFACE_TYPE PHYSICAL
MAX_ERRORS 500
MERGE_MINIMUM 5
NET_NAME_CHARS '#%&()*+-./:=>?@[]^_`|'
NET_NAME_LENGTH 24
OVERSIGHTS ON
REPLACE_CHECK OFF
SINGLE_NODE_NETS ON
SPLIT_MINIMUM 0
SUPPRESS 20
WARNINGS ON
No error detected
No oversight detected
No warning detected
cpu time 0:01:16
elapsed time 0:00:00
INFO(ORCAP-32005): *** Done ***
Do you even read what I write?... It will open the new board, now select place -> manually, check the checkboxes on the parts you want to place now and put them into the board, when you´re done click ok. On the left side use the Add connect tool (F3) to make the connections between the parts. Be sure to check out the three tabs on the right of the screen, where you set layers, width etc in Option, then the Visibility, and Find which toggles which features of the part are selectable, like wires pins names etc. You should end up with about the same board like I posted before.
It will open the new board, now select place -> manually, check the check boxes on the parts you want to place now and put them into the board, when you´re done click ok.
side use the Add connect tool (F3) to make the connections between the parts.